NIT No. | Subject | Date | Documents |
Publishing Date | Submission Start Date | Submission End Date | Opening Date | NIT | Tender |
3087 nit 304 offiline w | wall paint dr karnisingh circal to ganganagar choraha both side of road | 13-03-2023 | 13-03-2023 | 20-03-2023 6:00PM | 20-03-2023 | Download | - |
3087 nit 304 offiline 2 | musiuam circal to deendayal circal and karnisingh stadium wall paint both side | 13-03-2023 | 13-03-2023 | 20-03-2023 6:00PM | 20-03-2023 | Download | - |
2779 nit 301 ojhasatsang | Tin Shed work at Ojha Satsang Bhawan | 03-03-2023 | 09-03-2023 | 18-03-2023 6:00PM | 20-03-2023 | Download | - |
2763 nit 247 w 11 | Construction work at ward 11 | 03-03-2023 | 09-03-2023 | 18-03-2023 6:00PM | 20-03-2023 | Download | - |
2401 nit 213 w 77 | Construction work at ward 77 | 21-02-2023 | 27-02-2023 | 08-03-2023 6:00PM | 09-03-2023 | Download | - |
2398 nit 280 w 51 | Sewer Line and Road work at ward 51 | 21-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
2282 nit 283 w 15 | Construction of Road at ward 15 | 22-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
2279 nit 282 w 38 | Road work at ward 38 | 22-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
11419 nit 279 w 64 | Construction of Nalla and Road at ward 64 | 21-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
2403 nit 287 w 38 | Construction of Road gali no 2,3,4 ward 38 | 23-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
11482 nit 273 w 58 | Construction work at ward 58 | 23-02-2023 | 27-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
2330 nit 284 w 36 | Construction work at ward 36 | 22-02-2023 | 25-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
11416 nit 278 ward17park | Construction of Parks and Cross at ward 17 | 21-02-2023 | 24-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
2347 nit 285 nathaniyasar | Construction of Nathaniya Sarya's gate | 22-02-2023 | 25-02-2023 | 07-03-2023 6:00PM | 08-03-2023 | Download | - |
11456 nit 270 w 21 | Construction of Road at ward 21 | 23-02-2023 | 25-02-2023 | 06-03-2023 6:00PM | 08-03-2023 | Download | - |
2439 nit 250 w 54 | Construction work at ward 54 | 21-02-2023 | 25-02-2023 | 06-03-2023 6:00PM | 08-03-2023 | Download | - |
1910 nit 4 labour | 100 Cleaning workers supply work | 10-02-2023 | 13-02-2023 | 06-03-2023 6:00PM | 07-03-2023 | Download | - |
1658 nit 0 3tractor | Tractor Trolley with Manpower Service | 06-02-2023 | 07-02-2023 | 02-03-2023 6:00PM | 03-03-2023 | Download | - |
11324 nit 276 ojhastasang | Tin shed work at Ojha Satsang Bhawan | 15-02-2023 | 20-02-2023 | 01-03-2023 6:00PM | 02-03-2023 | Download | - |
11330 nit 277 w 11 | Construction work at ward 11 | 15-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
2262 nit 237 w 29 | Construction of Nali Cross at ward 29 | 16-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
11327 nit 275 w 04samuday | Construction of Samudayik Hall Valmiki Basti ward 04 | 15-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
11295 nit 255 w 25 | Jhula work at ward 25 park | 15-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
2190 nit 274 karnisewa | Tinshed work at Karni sewa Sadan Bhawan | 15-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
11286 nit 269 w 71 | Construction of Road at ward 71 | 14-02-2023 | 20-02-2023 | 27-02-2023 6:00PM | 28-02-2023 | Download | - |
1832 nit 16 light2022OnOf | Switching System operating work and light meter reading work of Road light | 09-02-2023 | 13-02-2023 | 24-02-2023 6:00PM | 27-02-2023 | Download | - |
1883 nit01light2023Decora | Light Decoration work on various occasions | 10-02-2023 | 13-02-2023 | 24-02-2023 6:00PM | 27-02-2023 | Download | - |
1784 nit 248 w 69 nalla | Construction of Nalla at ward 69 in front of Vinoba ground | 09-02-2023 | 13-02-2023 | 23-02-2023 6:00PM | 24-02-2023 | Download | - |
1781 nit 249 w 67 nalla | Construction of Nalla at ward 67 behind Nagar nigam Bhandar | 09-02-2023 | 13-02-2023 | 23-02-2023 6:00PM | 24-02-2023 | Download | - |
1778 nit 267 wk 1w 12 | 1 Construction work at ward 12 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1778 nit 267 wk 2 w 11 | 2 Construction work at ward 11 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1778 nit 267 wk 3 w 49 | 3 Construction work at ward 49 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1778 nit 267 wk 4 w 34 | 4 Construction work at ward 34 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1778 nit 267 wk 5 w 05 | 5 Construction work at ward 05 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1787 nit 264 w 23 | Construction work at ward 23 | 09-02-2023 | 13-02-2023 | 22-02-2023 6:00PM | 23-02-2023 | Download | - |
1690 nit 260 vyaspark | Construction of Bathroom and Toilet at Vyas park Jassolai | 07-02-2023 | 10-02-2023 | 20-02-2023 6:00PM | 21-02-2023 | Download | - |
1366 nit 03 tent | Temporary Tent Accessories Service | 02-02-2023 | 06-02-2023 | 20-02-2023 6:00PM | 20-02-2023 | Download | - |
1622 nit 262 w 61 | Construction work at ward 61 | 06-02-2023 | 08-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1617 nit 263 w02 & 03 | 1 Construction work at ward 02 | 06-02-2023 | 08-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1617 nit 263 w 03 | 2 Construction work at ward 03 | 06-02-2023 | 08-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1679 nit 259 w1 wd 79 | 1 Construction work at ward 79 | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1679 nit 259 w2 | 2 Construction of Samudayik Hall near Bissa Panchayat trust | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1679 nit 259 work 3 | 3 Construction of Samudayik Hall near Bajrang Vyayamshala | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1679 nit 259 work 4 | 4 Construction of Samudayik Hall at Bikaner Education Society Darul Ulum Sulemaniya Rehmaniya | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1679 nit 259 work5 wd17 | 5 Renovation of Park at ward 17 | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1684 nit 265 eidgahgate | Construction wall and gate of Eidgah | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
11225 nit 266 gujarkabris | Development works at Muslim Gurjar Kabristaan | 07-02-2023 | 09-02-2023 | 18-02-2023 6:00PM | 20-02-2023 | Download | - |
1274 nit 254 pumpingstati | O and M of SPS Public Park Bikaner for 2 years | 01-02-2023 | 03-02-2023 | 13-02-2023 6:00PM | 14-02-2023 | Download | - |
1291 nit 02 health | Catching of Awara Gowansh and Parivahan work | 02-02-2023 | 02-02-2023 | 13-02-2023 6:00PM | 14-02-2023 | Download | - |
1344 nit 256 supplybrickb | Supply of Cement, CC Block, Brick, Grit etc | 02-02-2023 | 02-02-2023 | 13-02-2023 6:00PM | 14-02-2023 | Download | - |
1510 nit 235 w 09 | Open Gym and Jhula work at ward 09 park | 03-02-2023 | 06-02-2023 | 13-02-2023 6:00PM | 14-02-2023 | Download | - |
1345 nit 258 w 31 | Construction of Nalla at ward 31 | 02-02-2023 | 06-02-2023 | 13-02-2023 6:00PM | 14-02-2023 | Download | - |
1343 nit 257 coloursupply | Supply of Colour | 02-02-2023 | 02-02-2023 | 09-02-2023 6:00PM | 10-02-2023 | Download | - |
1075 nit-215 w 4 | Construction work at ward 04
| 25-01-2023 | 30-01-2023 | 08-02-2023 6:00PM | 09-02-2023 | Download | - |
11157 nit-252 | Construction of Boundary wall at bhinasar Samsaan Bhoomi | 25-01-2023 | 30-01-2023 | 06-02-2023 6:00PM | 07-02-2023 | Download | - |
11122 nit 251 kripalbhair | Construction of Kitchen at Kripal Bhairu Samudayik Bhawan ward 55 | 23-01-2023 | 24-01-2023 | 02-02-2023 6:00PM | 03-02-2023 | Download | - |
11119 nit 253 jeewannathb | Construction work at Jeewanath bagechi ward 23 | 23-01-2023 | 24-01-2023 | 02-02-2023 6:00PM | 03-02-2023 | Download | - |
10967 nit 236 w 25 darsam | Construction work at dar Samaj Samudayik Bhawan ward 25 | 17-01-2023 | 19-01-2023 | 29-01-2023 6:00PM | 30-01-2023 | Download | - |
10973 nit 246 w62 wn 01 | 1 Construction of Block at Hamalo ka Kabristan | 17-01-2023 | 18-01-2023 | 27-01-2023 6:00PM | 30-01-2023 | Download | - |
10973 nit 246 w62 wn 02 | 2 Construction of Block at Brahmchatriya samaj samsaan bhoomi ward 62 | 17-01-2023 | 18-01-2023 | 27-01-2023 6:00PM | 30-01-2023 | Download | - |
10949 nit 244 choukhunti | Construction of Nalla, Nali near by area of Choukhunti ROB | 13-01-2023 | 17-01-2023 | 26-01-2023 6:00PM | 27-01-2023 | Download | - |
638 nit 245 w 14 | Road work at ward 14 | 16-01-2023 | 17-01-2023 | 26-01-2023 6:00PM | 27-01-2023 | Download | - |
10958 nit 241 RUBsewer | Trench less method sewer Line work near RUB Rani Bazar | 13-01-2023 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10970 nit 240 w 33 | Construction of CC Road at ward 33 | 17-01-2023 | 19-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
13715 nit 228 pushkarnabh | Construction of Samudayik Hall and Rasoi near Bajrang Vyayamshala | 12-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10836 nit 233 w 11BT | Exercise equipments and Bench work at Mansukh vihar park ward 25 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10839 nit 234 w 11CCroad | Construction of CC Road near choudhary charan singh hostel ward 11 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10813 nit 216 w 16 | Construction of CC Road near choudhary charan singh hostel ward 11 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10822 nit 232 w02 | Construction work at ward 02 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10825 nit 231 w 79 | Construction work at ward 79 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10819 nit 226 wbissapanch | Construction Samudayik Hall near Bissa Panchayat Trust | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10816 nit 230 w 17 | Construction work at ward 17 | 15-12-2022 | 16-01-2023 | 25-01-2023 6:00PM | 27-01-2023 | Download | - |
10964 nit 238 w 37 | Construction of CC Block road near Bhutta Kabristan ward 37 | 13-01-2023 | 17-01-2023 | 24-01-2023 6:00PM | 25-01-2023 | Download | - |
10955 nit 239 w 52 | Repair of Road at ward 52 | 13-01-2023 | 17-01-2023 | 24-01-2023 6:00PM | 25-01-2023 | Download | - |
10952 nit 243 bhandar | Shifting of Wall of Nagar Nigam Bhandar | 13-01-2023 | 17-01-2023 | 24-01-2023 6:00PM | 25-01-2023 | Download | - |
13718 nit 229 madarsa | Construction of Samudayik Hall at Bikaner Education Society | 12-12-2022 | 16-01-2023 | 23-01-2023 6:00PM | 24-01-2023 | Download | - |
13598 nit 227 indiracolon | Tin shed work at karni seva sadan bhawan | 09-12-2022 | 16-01-2023 | 23-01-2023 6:00PM | 24-01-2023 | Download | - |
18229 nit 219 w 25 | Exercise equipments and Bench work at Mansukh vihar park ward 25 | 15-12-2022 | 16-01-2023 | 23-01-2023 6:00PM | 24-01-2023 | Download | - |
19946-48 nit 242 | Name of work :- Supply of Various Construction Material | 11-01-2023 | 12-01-2023 | 21-01-2023 6:00PM | 23-01-2023 | Download | - |
10895 nit 212 wno 77 | Name of work : Construction of CC Road near Kotgar railway fatak | 05-01-2023 | 13-01-2023 | 19-01-2023 6:00PM | 20-01-2023 | Download | - |
591 nit 01 nitkhel | supply of playing equipments | 13-01-2023 | 16-01-2023 | 19-01-2023 5:00PM | 20-01-2023 | Download | - |
13882 nit 1 stati wno1 | 1 Flowers and decoration work, | 14-12-2022 | 04-01-2022 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13885 nit 2 statio w 1 | 1 Photography work, | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13879 nit 3 stationery | Flex banner printing work | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13882 nit 1 stati wno2 | 2 Sound system work | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13882 nit1 stati w3 refl | 3 Printer Refilling work | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13882 nit1 stati w4 xero | 4 Photostate work | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
13885 nit 2 statio w 2 | 2 Videography work | 14-12-2022 | 04-01-2023 | 12-01-2023 6:00PM | 13-01-2023 | Download | - |
440 nit 03 bhandar food e | Food, Breakfast, Water etc supply work | 15-12-2022 | 30-12-2022 | 09-01-2023 6:00PM | 12-01-2023 | Download | - |
17296 nit 218 w 63 | Construction work at ward 63 | 05-12-2022 | 09-12-2022 | 17-12-2022 6:00PM | 19-12-2022 | Download | - |
17324 nit 01 dog | avara janwar ka tikakaran regarding | 07-12-2022 | 08-12-2022 | 17-12-2022 6:00PM | 19-12-2022 | Download | - |
13560 nit 225 w 56 nalla | Repair and covering of nalla near chunna bhatta ward 56 | 09-12-2022 | 10-12-2022 | 16-12-2022 6:00PM | 19-12-2022 | Download | - |
10710 nit 223 w 14 | Construction of Wall and Road at Indira Colony | 25-11-2022 | 28-11-2022 | 08-12-2022 6:00PM | 09-12-2022 | Download | - |
10717 nit 224w33nayaksama | Construction of Boundary wall at ward 33 Nayak Samaj Samsaan Bhoomi | 25-11-2022 | 29-11-2022 | 08-12-2022 6:00PM | 09-12-2022 | Download | - |
16822 nit 217 w 16 | Construction work at ward 16 | 28-11-2022 | 29-11-2022 | 08-12-2022 6:00PM | 09-12-2022 | Download | - |
16698 nit 222 ENT work | Tin shed work at ENT Hospital Indira Rasoi | 24-11-2022 | 28-11-2022 | 06-12-2022 6:00PM | 07-12-2022 | Download | - |
16537 nit 07 yantralayaba | Supply of Battery for Various Vehicles | 23-11-2022 | 28-11-2022 | 06-12-2022 6:00PM | 07-12-2022 | Download | - |
16343 nit 221 nirman w72 | Construction of CC Road at ward 72
| 22-11-2022 | 24-11-2022 | 30-11-2022 6:00PM | 02-12-2022 | Download | - |
10642 nit 220 nirman 2022 | construction of cc block at Ramlal nai to ghnshyam house ward 26 27 | 17-11-2022 | 19-11-2022 | 25-11-2022 6:00PM | 28-11-2022 | Download | - |
10582 nit 211 ward66 | Construction work at ward 66 | 10-11-2022 | 15-11-2022 | 24-11-2022 6:00PM | 25-11-2022 | Download | - |
10579 nit 210 w 35 | Construction work at ward 35 | 10-11-2022 | 15-11-2022 | 24-11-2022 6:00PM | 25-11-2022 | Download | - |
11410 nit 195 w01 | Construction work at ward 01 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
11411 nit 201 w43 | Construction work at ward 43 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
10551 nit 202 w69 | Construction work at ward 69 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
10548 nit203w47 | Construction work at ward 47 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
11373 nit 205 w 62 | Construction work at ward 62 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
10533 nit 206 w 57 | Construction work at ward 57 | 09-11-2022 | 14-11-2022 | 23-11-2022 6:00PM | 24-11-2022 | Download | - |
11486 nit 209 w 23 | Construction of CC Road at ward 23 | 09-11-2022 | 14-11-2022 | 21-11-2022 6:00PM | 22-11-2022 | Download | - |
14409 nit 200 w21 | Construction work at ward 21 | 09-11-2022 | 11-11-2022 | 21-11-2022 6:00PM | 22-11-2022 | Download | - |
NIT No 208/2022-23 | Operation and maintenance of SPS, Public Park Bikaner & Machinery system.
| 09-11-2022 | 09-11-2022 | 18-11-2022 6:00PM | 21-11-2022 | Download | - |
376-382 nit 2 | Purchage of All in one PC and Printers | 07-11-2022 | 08-11-2022 | 18-11-2022 6:00PM | 22-11-2022 | Download | Download |
10502 nit 207 bhandar | 1 Construction of BT Road at Bhandar office | 07-11-2022 | 09-11-2022 | 18-11-2022 6:00PM | 21-11-2022 | Download | - |
10502 nit 207 bhandar 02 | 2 Repair of Old Room at Bhandar office | 07-11-2022 | 09-11-2022 | 18-11-2022 6:00PM | 21-11-2022 | Download | - |
10505 nit187w43rajnihospi | Construction of Samudayik Hall near Rajni Hospital Bissa Panchayat trust | 07-11-2022 | 09-11-2022 | 18-11-2022 6:00PM | 21-11-2022 | Download | - |
10332 nit 199 madarsa | Construction work at Madarsa Ahale Sunnat kuran Bikaner | 21-10-2022 | 31-10-2022 | 09-11-2022 6:00PM | 10-11-2022 | Download | - |
1885 nitv02 healthjetting | Hiring of man power for Sewerage work from Jetting machine | 28-10-2022 | 29-10-2022 | 07-11-2022 6:00PM | 09-11-2022 | Download | - |
10302 nit 192 vyaspark | Construction of Hall at Vyas Park Bikaner | 19-10-2022 | 21-10-2022 | 31-10-2022 6:00PM | 01-11-2022 | Download | - |
10250 nit 198 w 31 | Construction work at ward 31 | 13-10-2022 | 18-10-2022 | 27-10-2022 6:00PM | 28-10-2022 | Download | - |
18370 nit 01 gaushala | Green and dry fodder supply work at Kanji House Nathaniya goushala | 14-10-2022 | 15-10-2022 | 26-10-2022 6:00PM | 27-10-2022 | Download | - |
12243 nit 196 madarsa | Construction work at Madarsa Ahle Sunnat Faijanul Kuran Bikaner | 12-10-2022 | 14-10-2022 | 20-10-2022 6:00PM | 21-10-2022 | Download | - |
12246 nit 197 bhandar | Construction work at nagar nigam bhandar | 12-10-2022 | 14-10-2022 | 20-10-2022 6:00PM | 21-10-2022 | Download | - |
10238 nit 194 nagarnigamc | Aluminium Cabine work at new hall of nagar nigam main office
| 12-10-2022 | 14-10-2022 | 20-10-2022 6:00PM | 21-10-2022 | Download | - |
10872 nit 180 w 11 | Construction work at ward 11 | 06-10-2022 | 10-10-2022 | 19-10-2022 6:00PM | 20-10-2022 | Download | - |
10867 nit 190 w 70 | Construction work at ward 70 | 06-10-2022 | 10-10-2022 | 19-10-2022 6:00PM | 20-10-2022 | Download | - |
10870 nit 191 w77 | Construction work at ward 77 | 06-10-2022 | 10-10-2022 | 19-10-2022 6:00PM | 20-10-2022 | Download | - |
10894 nit 193 w70 | Construction of wall at park of ward 70 | 07-10-2022 | 10-10-2022 | 17-10-2022 6:00PM | 18-10-2022 | Download | - |
18045 compu nit 2 IRGY | Purchase of Computer All in one PC under IRGY
| 07-10-2022 | 11-10-2022 | 17-10-2022 6:00PM | 18-10-2022 | Download | - |
10876 nit 189 w 75 | Construction of Stone road at Bhujia Bazar ward 75 | 06-10-2022 | 10-10-2022 | 17-10-2022 6:00PM | 18-10-2022 | Download | - |
10786 nit 129 nalladpr | Preparation of DPR for Storm Water Drainage | 28-09-2022 | 03-10-2022 | 12-10-2022 6:00PM | 14-10-2022 | Download | - |
10778 nit 182 w 07 | Construction of boundary wall and Path at Bhinasar Park ward 07 | 28-09-2022 | 03-10-2022 | 12-10-2022 6:00PM | 14-10-2022 | Download | - |
1084 2nit 188 w41 | Construction work near lalgarh masjid ward 41 | 30-09-2022 | 03-10-2022 | 12-10-2022 6:00PM | 14-10-2022 | Download | - |
10821nit186 w76 | Construction work ward no 76 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10793 nit 181 northoffice | Repair work at North office nagar nigam bikaner | 29-09-2022 | 03-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10790 nit 179 nagnechiroa | Construction of wall near Nagnechiji Temple Road | 28-09-2022 | 03-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
16947 nit14 Light mpc | Electric work at Muktaprasas ward 17 | 23-09-2022 | 27-09-2022 | 10-10-2022 6:00PM | 12-10-2022 | Download | - |
17000 nit15 Light w55 | Electric work at ward 55 | 23-09-2022 | 27-09-2022 | 10-10-2022 6:00PM | 12-10-2022 | Download | - |
11519 nit 160 w 21 | Construction work at ward 21 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
17516 nit 161 w 20 | Construction work at ward 20 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10831 nit 183 w 54 | Construction work at ward 54 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10824 nit 184 w 56 | Construction work at ward 56 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10827 nit 185 w 44 | Construction work at ward 44 | 29-09-2022 | 01-10-2022 | 10-10-2022 6:00PM | 11-10-2022 | Download | - |
10706 nit 173 nigamblock | Block and Bench work at nagar nigam main office | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10716 nit 174 w 71 | Construction work at ward 71 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10728 nit 175 w 26 | Construction work at ward 26 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10725 nit 17 6w 27 | Construction work at ward 27 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10722 nit 177 w 22 | Construction work at ward 22 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10719 nit 178 w 23 | Construction work at ward 23 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10693 NIT 167 W 55 | Construction work at ward 55 | 22-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10684 nit 169 w 38 | Constructiion work at ward 38 | 22-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10710 NIT171 W 30 | Construction work at ward 30 | 23-09-2022 | 27-09-2022 | 06-10-2022 6:00PM | 07-10-2022 | Download | - |
10684 nit 170 pbm | Repair of Road at PBM Hospital | 22-09-2022 | 27-09-2022 | 05-10-2022 6:00PM | 06-10-2022 | Download | - |
10687 NIT 168 W 29 | Construction work at ward 29 | 22-09-2022 | 27-09-2022 | 05-10-2022 6:00PM | 06-10-2022 | Download | - |
313 NIT 06 equipments | Purchase of Sewer Cleaning Safety equipments | 22-09-2022 | 23-09-2022 | 04-10-2022 6:00PM | 07-10-2022 | Download | - |
10713 nit 172 nigamroom | Room and Toilet work at Nagar nigam main office
| 23-09-2022 | 27-09-2022 | 03-10-2022 6:00PM | 04-10-2022 | Download | - |
10626 nit 157 w 52 | Construction work at ward 52 | 19-09-2022 | 23-09-2022 | 03-10-2022 6:00PM | 04-10-2022 | Download | - |
16714 nit 159 w 42 | Construction work at ward 42 | 19-09-2022 | 23-09-2022 | 03-10-2022 6:00PM | 04-10-2022 | Download | - |
16635 nit 163 w 29 | Construction work at ward 29 | 20-09-2022 | 23-09-2022 | 03-10-2022 6:00PM | 04-10-2022 | Download | - |
10642 nit 165 w 46 | Construction work at ward 46
| 20-09-2022 | 23-09-2022 | 03-10-2022 6:00PM | 04-10-2022 | Download | - |
10652 nit 166 bhandar | Construction of Room and Toilet at Nagar Nigam Bhandar office | 21-09-2022 | 23-09-2022 | 29-09-2022 6:00PM | 30-09-2022 | Download | - |
16527 nit 149 w 73 | Construction work at ward 73 | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
16536 nit 150 w 59 | Construction work at ward 59 | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
16531 nit 151 w 57 | Construction work at ward 57 | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
16533 nit 152 w 24 | Construction work at ward 24 | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
10569 nit 153 w 64 | Construction work at ward 64
-- | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
10599 nit 154 w 75 | Construction work at ward 75
-- | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
10602 nit 155 w 74 | construction work at ward 74 | 15-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
10606 nit 156 w65 | Construction work at ward 65 | 16-09-2022 | 19-09-2022 | 28-09-2022 6:00PM | 29-09-2022 | Download | - |
10505-07 nit 126 w 11 | Construction work at ward 11
| 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
10508 nit 144 w 9 | Construction work at ward 09
| 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
16271 nit 145 w 53 | Construction work at ward 53
| 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
10511 nit 146 | Road Repair Package at East Area of Bikaner | 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
10502 nit 147 w 17 | Construction work at ward 17 | 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
10531 nit 148 w 70 | Construction work at ward 70 | 14-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
10610 nit 158 w 71 | Construction work at ward 71 | 16-09-2022 | 17-09-2022 | 27-09-2022 6:00PM | 28-09-2022 | Download | - |
16097 nit 10l High Mast l | High Mast ligh work at ward 03,09,10,19,20,25,30,38,44,50,52,56,71,73 and 80 | 09-09-2022 | 14-09-2022 | 26-09-2022 6:00PM | 27-09-2022 | Download | - |
10491 nit 143 w 58 | Construction work at ward 58 | 13-09-2022 | 15-09-2022 | 26-09-2022 6:00PM | 27-09-2022 | Download | - |
16261 nit 142 w 80 | Construction work at ward 80 | 13-09-2022 | 15-09-2022 | 26-09-2022 6:00PM | 27-09-2022 | Download | - |
10488 nit 141 w 14 | Construction work at ward 14 | 13-09-2022 | 15-09-2022 | 26-09-2022 6:00PM | 27-09-2022 | Download | - |
10485 nit 140 w 10 | Construction work at ward 10 | 13-09-2022 | 15-09-2022 | 26-09-2022 6:00PM | 27-09-2022 | Download | - |
15789 NIT 63 w09 | Preparation of DPR for Shivbari Talab Strengthing | 07-09-2022 | 09-09-2022 | 22-09-2022 6:00PM | 23-09-2022 | Download | Download |
10449 NIT 105 | Boundary wall work at dammami samaj kabristan
| 09-09-2022 | 13-09-2022 | 22-09-2022 6:00PM | 23-09-2022 | Download | - |
10452 NIT 139 | Teen shade work at Mohalla Punjabgiran Kabristan | 09-09-2022 | 13-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
15786 NIT 131 W 68 | Construction work at ward 68 | 07-09-2022 | 09-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10369 NIT 123 W 17 | Construction work at Mahadev Nagar, Rajiv Nagar ward 17 | 07-09-2022 | 09-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
15826 NIT 136 W 19 | Construction work at ward 19 | 07-09-2022 | 09-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10377 NIT 134 W 79 | Construction work at ward 79 | 07-09-2022 | 09-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10374 NIT 135 W 40 | Construction work at ward 40
| 07-09-2022 | 09-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
15904 NIT 05 MOB T | Purchage of Mobile Toilets | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10413 NIT 138 W 25 | Repair of Nalla near Chimpa Bhawan Mohta saray ward25 | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10410 NIT 133 W 25 | Construction work at ward 25 | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10406 NIT 132 W 32 | Construction work at ward 32 | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10403 NIT 137 W 38 | 1 Construction work at ward 38 | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
10403 NIT 137 W 15 W 2 | 2 Construction work at ward 15 | 08-09-2022 | 10-09-2022 | 19-09-2022 6:00PM | 20-09-2022 | Download | - |
15303-06 nit 117 | Operation and Maintenance of SPS, Public Park
| 29-08-2022 | 02-09-2022 | 19-09-2022 6:00PM | 21-09-2022 | Download | - |
15558 nit 127 w 71 | Construction work at ward 71 | 01-09-2022 | 06-09-2022 | 15-09-2022 6:00PM | 16-09-2022 | Download | - |
10271 nit 112 | NIT No.112 work No. 01 bangla nagar. | 29-08-2022 | 03-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10291-93 NIT 121 | Construction work at ward 12 | 30-08-2022 | 05-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10294-96 NIT 122 | Construction work at ward 41 | 30-08-2022 | 05-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10285-87 NIT 118 | Construction work at ward 09 | 30-08-2022 | 05-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10288-90 NIT 119 | Construction work at ward 33
| 30-08-2022 | 05-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10319-21 NIT 125 | Construction work at ward 51 | 31-08-2022 | 05-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10271 nit 112 work 02 | NIT No.112 Work No. 02 Ward No. 01 | 29-08-2022 | 03-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
10271 nit 112 work 03 | Construction work at Ward No. 19, 20 and Sarvoday Basti, Bikaner. | 29-08-2022 | 03-09-2022 | 14-09-2022 6:00PM | 15-09-2022 | Download | - |
15511 nit 124 ward no.42 | Construction of Road and Drain at ward 42 | 31-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10227-29 nit 111 wno07 | Construction work at ward 07 | 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10230-32 nit 113 | Construction work near shivbari circle bhagat singh colony
| 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10253-55 nit 115 work 1 | Mechanical Rolling shutters work at MRF Plant
| 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10253-55 nit 115 work 2 | Plinth Protection work at fire station shiv valley
| 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10259-61 nit 116 | Repair of Nalla at ward 67 | 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10256 nit 114 wno 67 | Name of work : Construction of Block road and Sewer Line at ward 67
| 29-08-2022 | 02-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
15575 NIT130 W 80 | Construction of Sewer Line and Road behind Rampuriya College ward 80 | 01-09-2022 | 06-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
15571 nit128 w22 | Repair of Road near Madhur Public School w22 | 01-09-2022 | 06-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10337 nit 108 w 60 | Construction work at ward 60 | 01-09-2022 | 06-09-2022 | 12-09-2022 6:00PM | 13-09-2022 | Download | - |
10206 nit 109 w 14 | Construction work at ward 14 | 26-08-2022 | 01-09-2022 | 10-09-2022 6:00PM | 12-09-2022 | Download | - |
10203 nit 107 w 42 | Construction work at ward 42 | 26-08-2022 | 01-09-2022 | 10-09-2022 6:00PM | 12-09-2022 | Download | - |
10200 nit 104 w 8 | Construction work at ward 08 | 26-08-2022 | 01-09-2022 | 10-09-2022 6:00PM | 12-09-2022 | Download | - |
10209 nit 110 w 38 | Construction work at ward 38 | 26-08-2022 | 01-09-2022 | 10-09-2022 6:00PM | 12-09-2022 | Download | - |
10185 nit 91 w 50 | Constructioin work at ward 50 | 25-08-2022 | 31-08-2022 | 09-09-2022 6:00PM | 12-09-2022 | Download | - |
10182 nit 92 w15 | Construction of Road near Dudi Sweets ward 15 | 25-08-2022 | 31-08-2022 | 09-09-2022 6:00PM | 12-09-2022 | Download | - |
10173 nit 90 wd 56 | Construction work at Kumawat Samsaan bhoomi ward 56 | 25-08-2022 | 31-08-2022 | 09-09-2022 6:00PM | 12-09-2022 | Download | - |
14896 NIT 99W 52 | Construction Road near MN Hospital ward 52 | 23-08-2022 | 31-08-2022 | 09-09-2022 6:00PM | 12-09-2022 | Download | - |
10179 NIT102 W 54 | Construction work at ward 54 | 25-08-2022 | 31-08-2022 | 09-09-2022 6:00PM | 12-09-2022 | Download | - |
10297-99 NIT 120 | Construction of wall of park at ward 70 | 30-08-2022 | 02-09-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10977 nit 93 w25 | Construction of Drain at ward 25 | 22-08-2022 | 30-08-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10170 NIT 95 | Construction work at Shri Ram Ramawat Swarg Asaram
| 25-08-2022 | 30-05-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10164 NIT 97 W 55 | Construction work at ward 55 | 25-08-2022 | 30-08-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10188 nit 94 rajnihospita | Construction of Drain on Rajni Hospital Road | 25-08-2022 | 30-08-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10191 NIT 98 W 10 | Construction work at ward 10
| 25-08-2022 | 30-08-2022 | 08-09-2022 6:00PM | 09-09-2022 | Download | - |
10161 NIT 103 W 37 | Construction of Road at ward 37 Yadav School Street | 25-08-2022 | 29-08-2022 | 07-09-2022 6:00PM | 08-09-2022 | Download | - |
10167 nit 45 wd 37 | Construction of Block road and Satsan Bhawan Hall at ward 37 | 25-08-2022 | 29-08-2022 | 07-09-2022 6:00PM | 08-09-2022 | Download | - |
10968 NIT 88 WD 13 | Construction work at ward No 13
| 18-08-2022 | 29-08-2022 | 07-09-2022 6:00PM | 08-09-2022 | Download | - |
10158 NIT 96 WD 37 | Construction work samudayik bhawan at ward 37 | 25-08-2022 | 29-08-2022 | 06-09-2022 6:00PM | 07-09-2022 | Download | - |
10176 NIT 101 W 13 | Construction of Block Road and Sewer Line near Grih Raksha Prasikchan Kendra w13 | 01-01-1900 | 31-08-2022 | 06-09-2022 6:00PM | 07-09-2022 | Download | - |
14639 NIT 89 WD 17 | Supply and fixing electric motor and water system at park of ward 17 | 22-08-2022 | 29-08-2022 | 05-09-2022 6:00PM | 06-09-2022 | Download | - |
10155 NIT 106 WARD 30 | Construction of CC Road and Drain at ward 30 | 25-08-2022 | 26-08-2022 | 05-09-2022 6:00PM | 06-09-2022 | Download | - |
10129 NIT 100 WN 01 | 1 Sewer Line, Frame and Cross work at Mukta Prasad | 24-08-2022 | 29-08-2022 | 05-09-2022 6:00PM | 06-09-2022 | Download | - |
10129 NIT 100 WN 03 | 3 Block work at sector no 08 mukta prasad | 24-08-2022 | 29-08-2022 | 05-09-2022 6:00PM | 06-09-2022 | Download | - |
10129 NIT 100 WN 02 |
2 Block work at Sector 14 Mukta Prasad
| 24-08-2022 | 29-08-2022 | 05-09-2022 6:00PM | 06-09-2022 | Download | - |
10953 NIT 77 ward 69 | Construction work at ward 69 | 18-08-2022 | 22-08-2022 | 01-09-2022 6:00PM | 02-09-2022 | Download | - |
14458 NIT 84 | Construction work at Bhaat Samaj Samshan Bhoomi | 18-08-2022 | 22-08-2022 | 31-08-2022 6:00PM | 01-09-2022 | Download | - |
14463 NIT85 w22 | Construction work at mali samaj samsaan bhoomi w22
| 18-08-2022 | 22-08-2022 | 31-08-2022 6:00PM | 01-09-2022 | Download | - |
10873 nit79 | Jungla work at head post office road | 17-08-2022 | 22-08-2022 | 31-08-2022 6:00PM | 01-09-2022 | Download | - |
10861 nit 76 | Construction work at Nayak Bheel Samaj Muktidham w18 | 17-08-2022 | 22-08-2022 | 31-08-2022 6:00PM | 01-09-2022 | Download | - |
10947 NIT 86 ward 15 | Construction of Block Road at ward 15 | 18-08-2022 | 22-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10900 nit 80 w no 17 | Construction work at ward 17 | 17-08-2022 | 19-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10864 nit 75 | Construction of Teen Shade at Mohalla Punjabgiran Kabristan | 17-08-2022 | 22-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10909 nit 83 | Construction work at ward 39 | 17-08-2022 | 19-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10906 NIT 82 WN 36 | Construction work at ward 36 | 17-08-2022 | 19-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10950 NIT 87 | sewer line work near polytechnic college | 18-08-2022 | 22-08-2022 | 29-08-2022 6:00PM | 30-08-2022 | Download | - |
10876 NIT 81 | Sewer Line work at Govt. Press Road | 17-08-2022 | 19-08-2022 | 25-08-2022 6:00PM | 26-08-2022 | Download | - |
10867 NIT 78 | Sewer Line work Near Chanchal Hanuman Ji Temple | 17-08-2022 | 19-08-2022 | 25-08-2022 6:00PM | 26-08-2022 | Download | - |
17903 NIT 72 WNO 65 | Construction work at ward 65 | 17-08-2022 | 19-08-2022 | 24-08-2022 6:00PM | 25-08-2022 | Download | - |
95 nit 01 store | supply of laddu | 08-08-2022 | 12-08-2022 | 23-08-2022 6:00PM | 25-08-2022 | Download | - |
13866 NIT 74 W N32 | Construction of CC Road at ward 32 | 08-08-2022 | 10-08-2022 | 19-08-2022 6:00PM | 22-08-2022 | Download | - |
13310 nit 70 | ARC Package Sewer Line, Drain Cross at ward 36 and 39
| 05-08-2022 | 08-08-2022 | 17-08-2022 6:00PM | 18-08-2022 | Download | - |
13313 nit 71 | Construction work at Dammamiyan/Daran Kabristan
| 05-08-2022 | 08-08-2022 | 16-08-2022 6:00PM | 17-08-2022 | Download | - |
10791 NIT 73 | Construction of CC Road at ward 71 | 08-08-2022 | 10-08-2022 | 16-08-2022 6:00PM | 17-08-2022 | Download | - |
10773 nit 62 nirman | Sewer Line, Chamber, Nali, Cross Package ARC at ward 09,10,11,12,34. | 04-08-2022 | 05-08-2022 | 15-08-2022 6:00PM | 16-08-2022 | Download | - |
257 nit 03 yantraylay | 10 HP Mud pump | 04-08-2022 | 05-08-2022 | 15-08-2022 6:00PM | 18-08-2022 | Download | - |
13305 nit 69 | Construction work at ward 39
| 05-08-2022 | 08-08-2022 | 15-08-2022 6:00PM | 16-08-2022 | Download | - |
13148 nit 13 light | High Mast light work at Sahid captain Chander Choudhary Smarak
| 04-08-2022 | 05-08-2022 | 13-08-2022 6:00PM | 16-08-2022 | Download | Download |
10776 nit 65 nirman | Construction of Toilet at MM Ground | 04-08-2022 | 05-08-2022 | 12-08-2022 6:00PM | 12-08-2022 | Download | - |
10732 nit 68 | Preparation of DPR on solid waste managemwent | 01-08-2022 | 04-08-2022 | 12-08-2022 6:00PM | 16-08-2022 | Download | - |
10729 NIT 67 | REPAIR ETC.WORK AT INDRA RASOI ARC | 01-08-2022 | 02-08-2022 | 11-08-2022 6:00PM | 12-08-2022 | Download | - |
10770 nit 64 nirman | Block and Brick work at nagar nigam office | 04-08-2022 | 05-08-2022 | 11-08-2022 6:00PM | 12-08-2022 | Download | - |
13124 nit 12 light | Purchage of AC and installation work | 04-08-2022 | 05-08-2022 | 11-08-2022 6:00PM | 12-08-2022 | Download | - |
12671 NIT 58 | ARC of Zone No 02 Sewerage, Nali, Cross | 28-07-2022 | 01-08-2044 | 10-08-2022 6:00PM | 12-08-2022 | Download | - |
1264 nit 01 health | 35HP tractor Trolley with driver and 02 labour work | 20-07-2022 | 20-07-2022 | 08-08-2022 6:00PM | 10-08-2022 | Download | - |
10671 NIT 61 WN 01 | 1 Nali, Cross, Sewer line Repair ARC work at zone No 05 | 25-07-2022 | 28-07-2022 | 06-08-2022 6:00PM | 08-08-2022 | Download | - |
10671 NIT 61 WN 02 | 2 Nali, Cross, Sewer line Repair ARC work at zone No 06 | 25-07-2022 | 28-07-2022 | 06-08-2022 6:00PM | 08-08-2022 | Download | - |
10620 nit 59 w 36 | Construction work behind Sadul Sports School ward 36 | 22-07-2022 | 25-07-2022 | 01-08-2022 6:00PM | 02-08-2022 | Download | - |
10629 nit 60 | Construction of CC Road from house of Ramswaroop Puniya via house of anoop vishnoi to house of kishanlal suthar. | 22-07-2022 | 25-07-2022 | 01-08-2022 6:00PM | 02-08-2022 | Download | - |
10586 nit 52 RCP Samsaan | Construction of Interlocking block in front of RCP Samsaan | 20-07-2022 | 22-07-2022 | 01-08-2022 6:00PM | 02-08-2022 | Download | - |
10583 NIT 56 | ARC work at Zone 03 and 04 | 20-07-2022 | 22-07-2022 | 01-08-2022 6:00PM | 02-08-2022 | Download | - |
12457 nit 11 light | electricity WORK IN INDRA RASOI AND MAIN OFFICE | 27-07-2022 | 28-07-2022 | 01-08-2022 9:00AM | 01-08-2022 | Download | - |
10575 NIT 55 ward 09 | Construction work at samudayik Bhawan ward 09 | 18-07-2022 | 21-07-2022 | 30-07-2022 6:00PM | 01-08-2022 | Download | - |
10614 NIT 57 | Construction of CC Block and Sewer Line work near grih Raksha Kendra | 21-07-2022 | 22-07-2022 | 28-07-2022 6:00PM | 29-07-2022 | Download | - |
10519 NIT 54 | Construction work at ward Sen Samaj Samsaan Bhoomi ward 21 | 11-07-2022 | 14-07-2022 | 23-07-2022 6:00PM | 25-07-2022 | Download | - |
13814 NIT 01 IR FLEX | Flex Banner etc work
| 13-07-2022 | 13-07-2022 | 20-07-2022 6:00PM | 21-07-2022 | Download | - |
10458 NIT 45 | Construction work at ward 07 | 06-07-2022 | 11-07-2022 | 20-07-2022 6:00PM | 21-07-2022 | Download | - |
10507 nit 51 | Construction of Sewer Line and Block Road Sadul Sports School | 11-07-2022 | 13-07-2022 | 19-07-2022 6:00PM | 20-07-2022 | Download | - |
10422 nit 50 | Construction work at ward 77 | 05-07-2022 | 06-07-2022 | 15-07-2022 6:00PM | 18-07-2022 | Download | - |
10440 nit 44 | Construction work at Samsaan bhoomi ward 17 sector 16
| 05-07-2022 | 06-07-2022 | 15-07-2022 6:00PM | 18-07-2022 | Download | - |
10455 NIT 30 | CONSTRUCTION OF WATER TANK AT SHYAMSHAN BHUMI WNO 30 | 06-07-2022 | 08-07-2022 | 14-07-2022 6:00PM | 15-07-2022 | Download | - |
10362 NIT 42 | Construction of CC Road at ward 14 | 28-06-2022 | 04-07-2022 | 11-07-2022 6:00PM | 12-07-2022 | Download | - |
10370 NIT 47 W NO 19 | Construction of Nalla at ward 19 | 28-06-2022 | 04-07-2022 | 11-07-2022 6:00PM | 12-07-2022 | Download | - |
12536 NIT06Light2022hm | High Mast Light work at ward no 13,15,16,17,22,35,54,58,62,65,67,77 | 24-06-2022 | 27-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
12712 nit 7 lt wn1 | 01 Electric work at Samudayik Bhawan ward no 09 | 24-06-2022 | 27-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
12712 nit 7 lt wn2 | 02 Electric work at Various Parks of ward 14 | 24-06-2022 | 27-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
12712 nit 7 lt wn3 | 03 Road Light work at Mukta Prasard Sector 06 to 17 | 24-06-2022 | 27-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
10337 nit 43 samsaan b | Construction work at Nai Samaj Samsaan bhoomi | 27-06-2022 | 29-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
10391 NIT 46 | CC BLOCK WORK DHARNIDHAR MAHADEV PARISAR | 27-06-2022 | 29-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
10334 NIT 39 | Construction of Road at Vallabh garden MRF Plant
| 27-06-2022 | 29-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
12971 NIT 48 | Construction work at ward 17 | 28-06-2022 | 29-06-2022 | 08-07-2022 6:00PM | 11-07-2022 | Download | - |
12116 nit 01 indra rasoi | Supply of Bartan for Indira Rasoi
| 17-06-2022 | 17-06-2022 | 07-07-2022 6:00PM | 08-07-2022 | Download | Download |
12137 NIT 03 COM INDRA | Supply of Computer etc for Indira Rasoi | 17-06-2022 | 17-06-2022 | 07-07-2022 6:00PM | 08-07-2022 | Download | Download |
12130 NIT 02Furniture RAS | Supply of Furniture for Indira Rasoi | 17-06-2022 | 17-06-2022 | 07-07-2022 6:00PM | 08-07-2022 | Download | Download |
10300 nit 40 | Construction work at ward 16 | 23-06-2022 | 27-06-2022 | 07-07-2022 6:00PM | 08-07-2022 | Download | - |
10254 nit 38 wn 01 | 01 Construction work at ward 52 | 22-06-2022 | 27-06-2022 | 06-07-2022 6:00PM | 07-07-2022 | Download | - |
10254 nit 38 wn 02 | 2 Park Renovation work near PBM hospital | 22-06-2022 | 27-06-2022 | 06-07-2022 6:00PM | 07-07-2022 | Download | - |
10254 nit 38 wn 03 |
3 Nalla Ferrocovering, Block and Repair work near Shahid Major Thomas SS School | 22-06-2022 | 27-06-2022 | 06-07-2022 6:00PM | 07-07-2022 | Download | - |
12576 nit 41 ward 25 | Construction work at ramawat Swami Samaj Samsaan ward 25 | 23-06-2022 | 27-06-2022 | 04-07-2022 6:00PM | 05-07-2022 | Download | - |
176 NIT 02 | yantralay driver supply | 10-06-2022 | 11-06-2022 | 01-07-2022 6:00PM | 04-07-2022 | Download | - |
12301 NIT 36 | Construction work at ward 18 Muktaprasad | 20-06-2022 | 23-06-2022 | 01-07-2022 6:00PM | 04-07-2022 | Download | - |
12295 nit 37 | ARC work of Sewer Line, Nali, Cross at zone 03 | 20-06-2022 | 23-06-2022 | 01-07-2022 6:00PM | 04-07-2022 | Download | - |
10249 nit 35 | Steel Builtup Gutter-Beam work at MRF Plant Bikaner | 20-06-2022 | 23-06-2022 | 01-07-2022 6:00PM | 04-07-2022 | Download | - |
12123 nit no 04 | Supply of Electric item for Indira Raso | 17-06-2022 | 17-06-2022 | 27-06-2022 6:00PM | 28-06-2022 | Download | - |
10162 NIT 34 | Prepare Detailed Project Report ana Rff | 14-06-2022 | 14-06-2022 | 27-06-2022 1:00PM | 27-06-2022 | Download | - |
NIT 33 2022-23 | samudayik bhawan se sarkari school tak,shivbani,ward no.09 me block sadak ka karya | 14-06-2022 | 14-06-2022 | 23-06-2022 6:00PM | 24-06-2022 | Download | - |
10076-78 nit 31 | construction work at word no.73 | 08-06-2022 | 13-06-2022 | 22-06-2022 6:00PM | 23-06-2022 | Download | - |
10073-75 nit 32 | prepration of dpr | 08-06-2022 | 13-06-2022 | 22-06-2022 6:00PM | 23-06-2022 | Download | - |
10120 nit 21 | Construction work at ward 39 | 10-06-2022 | 13-06-2022 | 22-06-2022 6:00PM | 23-06-2022 | Download | - |
10083 nit 29 | Road widening work Near Naganechi ji work | 08-06-2022 | 13-06-2022 | 22-06-2022 6:00PM | 23-06-2022 | Download | - |
10050-52 nit 27 | construction work at work no.32 | 10-06-2022 | 10-06-2022 | 20-06-2022 6:00PM | 21-06-2022 | Download | - |
nit20_2022_23 | ward no.54 nala work | 06-06-2022 | 06-06-2022 | 13-06-2022 6:00PM | 14-06-2022 | Download | - |
nit20_2022_23 work 2 | ward no.54 cross work | 06-06-2022 | 06-06-2022 | 13-06-2022 6:00PM | 14-06-2022 | Download | - |
887 nit 02 light ac | Supply of AC | 08-06-2022 | 09-06-2022 | 13-06-2022 6:00PM | 14-06-2022 | Download | - |
127 NIT 01 | Supply of Tractor with Mud Pump with O & M etc | 23-05-2052 | 26-05-2022 | 10-06-2022 6:00PM | 13-06-2022 | Download | - |
9978 80 NIT 25 | Construction work at Regar Samaj Samshan Bhoomi ward 09 shivbari | 27-05-2022 | 03-06-2022 | 09-06-2022 6:00PM | 10-06-2022 | Download | - |
9575 nit 26 w no 29 | Construction work at ward 29 | 27-05-2022 | 31-05-2022 | 06-06-2022 6:00PM | 07-06-2022 | Download | - |
9936 nit 18 z no7 | ARC Package civil work in Zone No 0 | 23-05-2022 | 25-05-2022 | 03-06-2022 6:00PM | 06-06-2022 | Download | - |
6995 nit 08 | Preparation of DPR for Storm water Drainage, Nallas in Bikaner city | 23-05-2022 | 25-05-2022 | 03-06-2022 6:00PM | 06-06-2022 | Download | - |
9890 nit23 wno 1 | 1 Construction work at Acharya shamsaan bhoomi | 17-05-2022 | 20-05-2022 | 30-05-2022 6:00PM | 31-05-2022 | Download | - |
9890 nit23 wno 2 | 2 Construction work at Kumawat shamsaan bhoomi | 17-05-2022 | 20-05-2022 | 30-05-2022 6:00PM | 31-05-2022 | Download | - |
9890 nit23 wno 3 | 3 Construction work at Rajput shamsaan bhoomi | 17-05-2022 | 20-05-2022 | 30-05-2022 6:00PM | 31-05-2022 | Download | - |
9898 nit 24 | Construction work at shamsaan at ward 17 | 18-05-2022 | 20-05-2022 | 30-05-2022 6:00PM | 31-05-2022 | Download | - |
9904 nit 19 | Construction work at Chimpan Kabristaan | 18-05-2022 | 20-05-2022 | 30-05-2022 6:00PM | 30-05-2022 | Download | - |
6006 nit 5light wn55 | High Mast Light work at ward 55 39 40 and 69 | 16-05-2022 | 18-05-2022 | 28-05-2022 6:00PM | 30-05-2022 | Download | - |
9901 nit 22 | Construction work at ward 37
| 18-05-2022 | 20-05-2022 | 26-05-2022 6:00PM | 27-05-2022 | Download | - |
5785 nit 23 light | Electric work at ward 17 | 11-05-2022 | 13-05-2022 | 23-05-2022 6:00PM | 25-05-2022 | Download | - |
87 nit 11 | - Supply of Tyre Tube ARC work
--
Bikaner nagar | 09-05-2022 | 12-05-2022 | 21-05-2022 6:00PM | 24-05-2022 | Download | - |
5708 nit 01 stationery | Mudran Samgri | 10-05-2022 | 12-05-2022 | 18-05-2022 6:00PM | 19-05-2022 | Download | - |
9798 nit 108 | Construction work at ward 65 | 05-05-2022 | 09-05-2022 | 18-05-2022 6:00PM | 19-05-2022 | Download | - |
9770 nit 16 | Construction work at ward 20 | 04-05-2022 | 06-05-2022 | 17-05-2022 6:00PM | 18-05-2022 | Download | - |
9773 nit 14 wn 01 | 1 Construction work at Valmiki Samaj Muktidham Pratap Basti | 05-05-2022 | 06-05-2022 | 16-05-2022 6:00PM | 17-05-2022 | Download | - |
9773 nit 14 wn 02 |
2 Construction work at Meghwal Samaj Muktidham w71 | 04-05-2022 | 06-05-2022 | 16-05-2022 6:00PM | 17-05-2022 | Download | - |
9776 nit 15 | Construction of Nalla Inside Vishwkarma Gate w57 | 04-05-2022 | 06-05-2022 | 16-05-2022 6:00PM | 17-05-2022 | Download | - |
7161 nit 10 | Open Air Gym work at 05 Parks of Nagar Nigam Bikaner
| 04-05-2022 | 06-05-2022 | 16-05-2022 6:00PM | 17-05-2022 | Download | - |
5549nit 04light 14 | Electric work at ward14 Parks | 06-05-2022 | 07-05-2022 | 13-05-2022 6:00PM | 16-05-2022 | Download | - |
9779 nit 17 | Construction at Nayak Samaj Samsaan Bhoomi w25 | 04-05-2022 | 06-05-2022 | 12-05-2022 6:00PM | 13-05-2022 | Download | - |
9729 NIT 4 W N55 | Construction work at ward 55 | 29-04-2022 | 04-05-2022 | 12-05-2022 6:00PM | 13-05-2022 | Download | - |
5514 nit 03 light | Supply of Cooler | 06-05-2022 | 07-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9689 nit11 wno 58 | Construction work at ward 58 | 28-04-2022 | 02-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9699 N 02 W N 1 | 1 Construction work at ramawat Swami Shamsaan
| 28-04-2022 | 02-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9699 N 02 W N 2 | 2 Construction work at Jaat Shamsaan Bhumi Mohta Saray w25 | 28-04-2022 | 02-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9699 N 02 W N 3 | 3 Dasnam Goswami Samadhi Sthal Bounday wall work | 28-04-2022 | 02-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9696 NIT 07 | Construction work at ward 79 | 28-04-2022 | 02-05-2022 | 11-05-2022 6:00PM | 12-05-2022 | Download | - |
9723 NIT 12 WNO10 | Construction work at ward 10 | 29-04-2022 | 02-05-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9726 NIT13 W 01 | Construction of CC Road at ward 52 | 29-04-2022 | 02-05-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9726 NIT13 W 02 | 2 Ferrocovering work all around Junagarh | 29-04-2022 | 02-05-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9732 NIT 03 WN 50 | Construction of Relling work at ward 50 | 29-04-2022 | 02-05-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9657 nit 100 | Construction of Nalla and Chamber behind Nagar nigam | 25-04-2022 | 28-04-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
4682 nit 106 new | Construction work at ward 78 | 25-04-2022 | 28-04-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9676 NIT 104 | Construction of park at ward 09
| 27-04-2022 | 29-04-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
4905 NIT 01 LIGHT | Decoration work on various occasions | 28-04-2022 | 29-04-2022 | 09-05-2022 6:00PM | 10-05-2022 | Download | - |
9666 nit 05 | Construction work at ward 37 | 26-04-2022 | 28-04-2022 | 05-05-2022 6:00PM | 06-05-2022 | Download | - |
4692 nit 24 light | Supply of Cooler | 25-04-2022 | 27-04-2022 | 03-05-2022 6:00PM | 05-05-2022 | Download | - |
9615 nit 109 | Construction work at ward 40 | 18-04-2022 | 21-04-2022 | 27-04-2022 6:00PM | 28-04-2022 | Download | - |
3904 NIT 110 | Construction work at ward 56 | 07-04-2022 | 13-04-2022 | 22-04-2022 6:00PM | 25-04-2022 | Download | - |
9461 nit 107 | Construction of Vidhut Shavdah Grih | 01-01-1900 | 31-03-2022 | 21-04-2022 6:00PM | 22-04-2022 | Download | - |
4011 NIT 01 | Construction work at ward 09 | 08-04-2022 | 13-04-2022 | 20-04-2022 6:00PM | 21-04-2022 | Download | - |
19 NIT 10 | YANTRALAYA TIRE TUBE ARC | 06-04-2022 | 07-04-2022 | 16-04-2022 6:00PM | 18-04-2022 | Download | - |
2332 NIT 07 | nigams highpower super sucker cum jetting machine's O&M sewer line etc cleaning work
| 11-03-2022 | 14-03-2022 | 12-04-2022 6:00PM | 15-04-2022 | Download | - |
4682 nit 106 | Construction work at ward 78 | 25-04-2022 | 28-04-2022 | 09-04-2022 6:00PM | 10-04-2022 | Download | - |
9331 NIT 98 | Construction work at ward 48 | 21-03-2022 | 23-03-2022 | 01-04-2022 6:00PM | 04-04-2022 | Download | - |
9380 nit 99 | Construction work at Bissa Panchayti Trust | 23-03-2022 | 25-03-2022 | 31-03-2022 6:00PM | 01-04-2022 | Download | - |
9410 nit 105 | Construction work at Regar Samaj Samudayik Bhawan | 23-03-2022 | 25-03-2022 | 31-03-2022 6:00PM | 01-04-2022 | Download | - |
3063 NIT 103 | Construction work at ward 12 | 16-03-2022 | 21-03-2022 | 30-03-2022 6:00PM | 31-03-2022 | Download | - |
2980 NIT 18 LIGHT | High mast Light work at ward 17 | 15-03-2022 | 16-03-2022 | 26-03-2022 6:00PM | 28-03-2022 | Download | - |
2967 NIT 14 WN O1 | 1 Street light system overhead line East area light work | 15-03-2022 | 16-03-2022 | 26-03-2022 6:00PM | 28-03-2022 | Download | - |
2967 NIT 14 WN O2 | 2 Street light system overhead line West area light work | 15-03-2022 | 16-03-2022 | 26-03-2022 6:00PM | 28-03-2022 | Download | - |
2973 NIT 17 LIGHT | Light Decoration work in Bikaner City area on various Festival | 15-03-2022 | 16-03-2022 | 23-03-2022 6:00PM | 24-03-2022 | Download | - |
2986 NIT 20 LIGHT | Light work at Main office of Nagar Nigam bikaner | 15-03-2022 | 16-03-2022 | 23-03-2022 6:00PM | 24-03-2022 | Download | - |
2992 NIT 21LIGHT | High Mast light work at ward 37 | 15-03-2022 | 16-03-2022 | 23-03-2022 6:00PM | 24-03-2022 | Download | - |
9209 NIT 101 | Construction work at ward 36 | 10-03-2022 | 14-03-2022 | 23-03-2022 6:00PM | 24-03-2022 | Download | - |
2405 Nit 01 Sthapana | Insurance work of Nagar Nigam's workers | 03-03-2022 | 07-03-2022 | 14-03-2022 6:00PM | 15-03-2022 | Download | - |
9026 nit 91 | Construction of Dome Structure | 23-02-2022 | 28-02-2022 | 09-03-2022 6:00PM | 10-09-2022 | Download | - |
9023 NIT 81 | Construction work at Park at KK Colony H Block | 23-02-2022 | 28-02-2022 | 09-03-2022 6:00PM | 10-03-2022 | Download | - |
2239 NIT 97 ward 16 | construction work at ward 16 | 24-02-2022 | 28-02-2022 | 09-03-2022 6:00PM | 10-03-2022 | Download | - |
9034 nit 95 ward 53 | Construction work at ward 53 | 24-02-2022 | 28-02-2022 | 07-03-2022 6:00PM | 08-03-2022 | Download | - |
9009 nit 96 w no 12 | Construction of CC Block road at ward 12 | 23-02-2022 | 25-02-2022 | 03-03-2022 6:00PM | 04-03-2022 | Download | - |
9012 nit 94 | Repair of Road near Tulsi Circle | 23-02-2022 | 25-03-2022 | 03-03-2022 6:00PM | 04-02-2022 | Download | - |
8925 NIT 93 | Construction work at ward 18 | 14-02-2022 | 18-02-2022 | 28-02-2022 6:00PM | 01-03-2022 | Download | - |
8915 NIT 90 | CC ROAD BOLCK WORK W NO 07 | 14-02-2022 | 16-02-2022 | 25-02-2022 6:00PM | 28-02-2022 | Download | - |
8864 nit 67 | Construction work at ward 25
-- | 07-02-2022 | 11-02-2022 | 21-02-2022 6:00PM | 22-02-2022 | Download | - |
8922 NIT 92 | CONSTRUCTION OF PULIYA AND REPAIRING OF DRAIN NEAR SATELITE HOSPITAL | 14-02-2022 | 15-02-2022 | 21-02-2022 6:00PM | 22-02-2022 | Download | - |
8813 NIT 60 CCROAD | Construction of CC Road at Ramnath Sadan Street | 31-01-2022 | 08-02-2022 | 17-02-2022 6:00PM | 18-02-2022 | Download | - |
8805 Nit 87 | Constructon of CC Road at ward 33 Majid Khan to Prabhu Ram | 31-01-2022 | 03-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
8805 Nit 87 work 2 | Construction of CC Road at ward 33 Mahendra Ji Charan to Sawai Singh
| 31-01-2022 | 03-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
8808 NIT 88 WK 01 | Construction work at Rajput Bhati Mukti Dham ward 09 | 31-01-2022 | 03-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
8808 NIT 88 WK 02 | Construction work at Mali Samaj Muktidham ward 09 | 31-01-2022 | 03-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
382 NIT 09 | Hiring of Poklane Machine with men and Fuel | 31-01-2022 | 01-02-2022 | 14-02-2022 6:00PM | 16-02-2022 | Download | - |
8817 NIT 89 WARD 51 | Construction work at ward 51 | 01-02-2022 | 04-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
8814 NIT 80 WARD 17 | Construction work at ward 37 | 01-02-2022 | 04-02-2022 | 14-02-2022 6:00PM | 15-02-2022 | Download | - |
365 Nit 06 | tractor trolly with labour for 80 wards and for 1 year | 12-01-2022 | 14-01-2022 | 14-02-2022 6:00PM | 17-02-2022 | Download | - |
8774 nit 85 | Construction work at ward 71 kadary colony | 25-01-2022 | 31-01-2022 | 09-02-2022 6:00PM | 10-02-2022 | Download | - |
8777 NIT 86 | Construction work at ward 80 | 25-01-2022 | 31-01-2022 | 09-02-2022 6:00PM | 10-02-2022 | Download | - |
909 NIT 01 | REGARDING DAY NULM SCHEEM MANAGEMENT OF SHELTER HOME REGARDING TENDER | 25-01-2022 | 25-01-2022 | 04-02-2022 4:00PM | 05-02-2022 | Download | - |
8713 nit 82 | Block work at ward 17 Mukta Prasad | 19-01-2022 | 24-01-2022 | 02-02-2022 6:00PM | 03-02-2022 | Download | - |
8738 nit 83 | Construction of Block road at ward 39 | 21-01-2022 | 25-01-2022 | 01-02-2022 6:00PM | 02-02-2022 | Download | - |
532 NIT 15 Light | work in nagar nigam office | 17-01-2022 | 19-01-2022 | 26-01-2022 6:00PM | 27-01-2022 | Download | - |
8724 Nit 84 | Sewer Line work at Standard Tea Company to Ambedkar Circle | 20-01-2022 | 21-01-2022 | 26-01-2022 6:00PM | 27-01-2022 | Download | - |
8414 Nit 65 | Construction of Nalla and Chamber behind nagar nigam | 11-01-2022 | 14-01-2022 | 25-01-2022 6:00PM | 27-01-2022 | Download | - |
8508 nit 79 ward 53 | Construction work at ward 53 | 11-01-2022 | 14-01-2022 | 24-01-2022 6:00PM | 25-01-2022 | Download | - |
8511 Nit 74 | Construction work at various Samsaan at East Area of Bikaner nagar nigam | 11-01-2022 | 14-01-2022 | 24-01-2022 6:00PM | 25-01-2022 | Download | - |
342 Nit 12 ward 37 | high mast light work at ward 37 | 12-01-2022 | 13-01-2022 | 24-01-2022 6:00PM | 27-01-2022 | Download | - |
8478 nit 78 wr no 20 | Construction work at ward 20 | 07-01-2022 | 10-01-2022 | 19-01-2022 6:00PM | 20-01-2022 | Download | - |
8410 nit 76 | Construction of Road, Drain and cross at ward 60 | 30-12-2021 | 03-01-2022 | 12-01-2022 6:00PM | 13-01-2022 | Download | - |
8413 nit 77 w no 52 | Construction of Block road at ward 52 | 30-12-2021 | 03-01-2022 | 12-01-2022 6:00PM | 13-01-2022 | Download | - |
308 NIT 08 | Supply of Tyre tube | 27-12-2021 | 28-12-2021 | 08-01-2022 6:00PM | 11-01-2022 | Download | - |
8368 nit 75 w no1 | Construction work at Chatolai Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no2 | 2 Construction work at Vaidh Maga Ram colony Meghwal Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no3 | 3 Construction work at Meghwal Samsaan Bhoomi Sarvodaya Basti | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no4 | 4 Construction work at Panwar Sankhla Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no5 | 5 Construction work at Ward 24 Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no6 | 6 Construction work at Ramawat Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no7 | 7 Construction work at Sen Samaj Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no8 | 8 Construction work at Bhargaw Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no9 | 9 Construction work at Jat Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no10 | 10 Construction work at Nayak samsaan ward 18 | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no11 | 11 Construction work at Hansawat bhojak Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8368 nit 75 w no12 | 12 Construction work at shakdwipiya Samsaan | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
8371 NIT 73 | 1 Construction of Nalla at ward No 31 | 27-12-2021 | 27-12-2021 | 06-01-2022 6:00PM | 07-01-2022 | Download | - |
216 nit 07 | 5 excavator cum loader machines with operator and fuel for 2 years | 30-11-2021 | 10-12-2021 | 03-01-2022 6:00PM | 05-01-2022 | Download | - |
12512 nit 9 high mast lig | HIGH MAST LIGHT WORK WARD NO 36 | 17-12-2021 | 20-12-2021 | 31-12-2021 6:00PM | 01-01-1900 | Download | - |
12290 NIT 10 Light W1 | treet Light System's Overhead Line, Under ground cable Fault at East area of Bikaner | 10-12-2021 | 11-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
12290 NIT 10 Light W2 | Street Light System's Overhead Line, Under ground cable Fault at West area of Bikaner | 10-12-2021 | 11-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
12284 NIT 11 light | Switching System etc work | 10-12-2021 | 11-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 01 | 1 Repair of Sewer Line at Zone No 01 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 02 | 2 Repair of Sewer Line at Zone No 05 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 03 | 3 Repair of Sewer Line at Zone No 06 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 04 | 4 Repair of Sewer Line at Zone No 08 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 05 | 5 Repair of Drain and Cross at Zone No 01 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 06 | Repair of Drain and Cross at Zone No 05 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 07 | 7 Repair of Drain and Cross at Zone No 06 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 08 | 8 Repair of Drain and Cross at Zone No 08 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 09 | 9 Repair of Drain and Cross and Sewer Line at Zone No 02 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
8212 NIT 72 W NO 10 | 10 Repair of Drain and Cross and Sewer Line at Zone No 04 | 10-12-2021 | 13-12-2021 | 22-12-2021 6:00PM | 23-12-2021 | Download | - |
166 NIT 06 | nit06yantralaya LODER MACHINE | 12-11-2021 | 13-11-2021 | 14-12-2021 6:00PM | 17-12-2021 | Download | - |
166 NIT No.06/Yantralaya | 05 Excavator cum Loader Machine for 02 Years | 12-11-2021 | 13-11-2021 | 06-12-2021 6:00PM | 09-12-2021 | Download | - |
7036 NIT No 63 | construction of CC Road at ganesh chowk indira colony | 20-10-2021 | 25-10-2021 | 03-11-2021 6:00PM | 08-11-2021 | Download | - |
6092 nit 61 work 1 | repair of roads at west area of bikaner ARC work | 18-10-2021 | 20-10-2021 | 29-10-2021 6:00PM | 01-11-2021 | Download | - |
6092 nit 61 work 2 | repair of roads at east area of bikaner ARC work | 18-10-2021 | 20-10-2021 | 29-10-2021 6:00PM | 01-11-2021 | Download | - |
6091E NIT No 57 | construction works at Loda Moda Bagechi | 08-10-2021 | 11-10-2021 | 20-10-2021 6:00PM | 21-10-2021 | Download | - |
6091E NIT No 57 nw2 | construction works at Nathsagar samadhi sthal | 08-10-2021 | 11-10-2021 | 20-10-2021 6:00PM | 21-10-2021 | Download | - |
191 mud pump | Mud Pump Yantralaya nit | 04-10-2021 | 08-10-2021 | 20-10-2021 6:00PM | 25-10-2021 | Download | - |
147 NIT No 05 Yantralay | Tyre Tube work | 28-09-2021 | 30-09-2021 | 11-10-2021 6:00PM | 14-10-2021 | Download | - |
4905 NIT No 55/2021-22 | Construction and Repair of Park at MuktaPrassad Sector 06-17 | 22-09-2021 | 27-09-2021 | 06-10-2021 6:00PM | 08-10-2021 | Download | - |
128 | Subpply and Delivery of Shav Yatra Vehicle | 22-09-2021 | 23-09-2021 | 05-10-2021 6:00PM | 06-10-2021 | Download | - |
4706 NIT No 53 w no 36 | Construction work at ward 36 | 08-09-2021 | 14-09-2021 | 22-09-2021 6:00PM | 23-09-2021 | Download | - |
4700 NIT No 39/2021-22 | Construction of Boundary Wall at Vallabh Garden Dumping yard
| 08-09-2021 | 13-09-2021 | 22-09-2021 6:00PM | 23-09-2021 | Download | - |
4703 NIT No 54 ward 10 | Construction work at ward 10 | 08-09-2021 | 13-09-2021 | 21-09-2021 6:00PM | 22-09-2021 | Download | - |
4662 NIT No 52/ w no 55 | Construction work at ward 55 | 03-09-2021 | 07-09-2021 | 16-09-2021 6:00PM | 17-09-2021 | Download | - |
8308 NIT No 05 Light | Hight Mast Light work at ward 14 and Ligh work at various Parks
| 03-09-2021 | 06-09-2021 | 16-09-2021 6:00PM | 17-09-2021 | Download | - |
4611 NIT No 50 W N 05 | Construction work at ward No 05 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 08 | Construction work at ward No 08 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 11 | Construction work at ward No 11 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 12 | Construction work at ward No 12 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 32 | Construction work at ward No 32 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 34 | Construction work at ward No 34 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 35 | Construction work at ward No 35 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 41 | Construction work at ward No 41 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4611 NIT No 50 W N 50 | Construction work at ward No 50 | 25-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4630 NIT No 51 ward n 9 | Construction of Road at ward No 09 | 26-08-2021 | 01-09-2021 | 10-09-2021 6:00PM | 13-09-2021 | Download | - |
4587 NIT No 49 w n 29 | Construction work at ward No 29 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 37 | Construction work at ward No 37 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 38 | Construction work at ward No 38 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 15 | Construction work at ward No 15 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 30 | Construction work at ward No 30 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 49 | Construction work at ward No 49 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
4587 NIT No 49 w n 13 | Construction work at ward No 13 | 25-08-2021 | 31-08-2021 | 09-09-2021 6:00PM | 10-09-2021 | Download | - |
8324 NIT No 07/2021-22 L | Light work at nagar nigam bikaner main office | 03-09-2021 | 04-09-2021 | 08-09-2021 6:00PM | 09-09-2021 | Download | - |
4398 NIT No 06/2021-22 | Construction of GAS Adharit Shav Dah Grih at RCP Colony | 12-08-2021 | 16-08-2021 | 06-09-2021 6:00PM | 07-09-2021 | Download | - |
4535 NIT No 47 wn 28 | Construction work at ward No 28 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 31 | Construction work at ward No 31 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 47 | Construction work at ward No 47 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 48 | Construction work at ward No 48 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 69 | Construction work at ward No 69 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 77 | Construction work at ward No 77 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 39 | Construction work at ward No 39 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 53 | Construction work at ward No 53 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
4535 NIT No 47 wn 54 | Construction work at ward No 54 | 18-08-2021 | 25-08-2021 | 03-09-2021 6:00PM | 06-09-2021 | Download | - |
7703 NIT No 48 wn 01 | Construction work at ward No 01 | 19-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 02 | Construction work at ward No 02 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 03 | Construction work at ward No 03 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 18 | Construction work at ward No 18 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 19 | Construction work at ward No 19 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 21 | Construction work at ward No 21 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 22 | Construction work at ward No 22 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 23 | Construction work at ward No 23 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 24 | Construction work at ward No 24 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 26 | Construction work at ward No 26 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 27 | Construction work at ward No 27 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 43 | Construction work at ward No 43 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 44 | Construction work at ward No 44 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 62 | Construction work at ward No 62 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 63 | Construction work at ward No 63 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 64 | Construction work at ward No 64 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 76 | Construction work at ward No 76 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
7703 NIT No 48 wn 78 | Construction work at ward No 78 | 18-08-2021 | 24-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
4484 NIT No 42/2021-22 | Repair of Sewer Line and Drain, Cross at Zone No 03 | 17-08-2021 | 20-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
4401 NIT No 46/2021-22 | Construction work Kanya Kubj Shamsaan Bhoomi ward 67 | 12-08-2021 | 23-08-2021 | 02-09-2021 6:00PM | 03-09-2021 | Download | - |
4481 NIT No 43/2021-22 | Construction of Road at ward 70 | 17-08-2021 | 23-08-2021 | 01-09-2021 6:00PM | 02-09-2021 | Download | - |
4404 NIT No 44/2021-22 | Construction work at Kabristan of East area of Bikaner | 12-08-2021 | 16-08-2021 | 26-08-2021 6:00PM | 27-08-2021 | Download | - |
4334 NIT N 41/2021-22 | Construction of CC Road at ward no 67 | 06-08-2021 | 16-08-2021 | 25-08-2021 6:00PM | 26-08-2021 | Download | - |
4407 NIT No 45/2021-22 | Sewer Line work at ward 32 Pawanpuri
| 12-08-2021 | 16-08-2021 | 23-08-2021 6:00PM | 24-08-2021 | Download | - |
4326 NIT Number 38/2021-2 | construction of road, drain, cross at ward no 06 | 06-08-2021 | 10-08-2021 | 20-08-2021 6:00PM | 23-08-2021 | Download | - |
indara rasoi_119 | EOI for indara rasoi_119 | 10-08-2021 | 10-08-2021 | 17-08-2021 6:00PM | 17-08-2021 | Download | - |
4288 NIT No 35/2021-22 | Sewer Line work KEM Road to Public park | 03-08-2021 | 06-08-2021 | 16-08-2021 6:00PM | 17-08-2021 | Download | - |
7271 NIT No 40/2021-22 | Construction of Floor work and Urinal work at Mahanand Talai | 04-08-2021 | 06-08-2021 | 16-08-2021 6:00PM | 17-08-2021 | Download | - |
6120 nit05_Health | aavara pashu pakdne ke liye | 19-07-2021 | 19-07-2021 | 13-08-2021 6:00PM | 16-08-2021 | Download | - |
4230 NIT No 33/2021-22 | Sewer Line, Drain Cross ARC work at zone 07 | 28-07-2021 | 02-08-2021 | 12-08-2021 6:00PM | 13-08-2021 | Download | - |
4249 NIT No 37/2021-22 | Preparation of DPR for Mayor House | 02-08-2021 | 04-08-2021 | 12-08-2021 6:00PM | 13-08-2021 | Download | - |
7193 w 1NIT No 04/2021-22 | High Mast Light work at ward 36 | 03-08-2021 | |